Leander ISd
Shot blast to remove asphaltic adhesive
![leanderblast1](../Library/components/carousels/single/images/leander/leander1.jpg)
![leanderblast2](../Library/components/carousels/single/images/leander/leander2.jpg)
![leanderblast3](../Library/components/carousels/single/images/leander/leander3.jpg)
![leander-blast4](../Library/components/carousels/single/images/leander/leander4.jpg)
Faubion Elementary School
Prep for moisture mitigation system
We were contracted to shot blast to remove existing asphaltic adhesive (tested negative for asbestos). After shot blasting to create a CSP of 3, flooring contractor applied an epoxy moisture mitigation system due to high levels of moisture in the concrete. After installing the epoxy, vct flooring was installed.