Concrete Leveling
Scarifier and grinder to level concrete



DKR Stadium, UT Austin
Prep for volleyball floor
The concrete floor in the stadium basement did not meet flatness specs for the installation of a volleyball court floor. Measurements were taken in a 5' grid with a ziplevel altimeter and high spots were ground down.